Bobcat Accessible (minimum 6’ wide clearance)
Single lot $0.57 / sqft |
Two adjacent lots $0.55 / sqft |
Three adjacent lots $0.53 / sqft |
Four or more adjacent lots $0.51 / sqft |
Single lot $0.57 / sqft |
Two adjacent lots $0.55 / sqft |
Three adjacent lots $0.53 / sqft |
Four or more adjacent lots $0.51 / sqft |
Single lot $0.67 / sqft |
Two adjacent lots $0.65 / sqft |
Three adjacent lots $0.63 / sqft |
Four or more adjacent lots $0.61 / sqft |
Single lot $0.67 / sqft |
Two adjacent lots $0.65 / sqft |
Three adjacent lots $0.63 / sqft |
Four or more adjacent lots $0.61 / sqft |
Final Grade Survey $300 / house |
Removing/replacing fence section $200 |
Extensive Weed removal $100 |
Misc. skid-steer work $110 / hour |
Misc. hand work $50 / man hour |
Adjacent lots include either lots directly adjacent or directly across the street from each other. All homeowners must sign within close enough time to each other that all lots can be scheduled and completed as one large lot.
River Valley Final Grading provides fully covid safe practices. From requesting a quote right right to installation and payment, there is no face-to-face contact unless requested by you.